0800 163 382 Call us Monday-Friday: 8.00am - 5.30pm
Menu

Rock Drilling at Gatwick Airport

We needed to remove the concrete foundation adjacent to aircraft jetty.

Dyer and Butler

RequirementsRock Drilling at Gatwick Airport

  • Removal of concrete foundation adjacent to aircraft jetty.
  • Aircraft parking bay to remain usable throughout the project.
  • Air bridge to remain operational at all times.
  • Concrete foundation 2m deep, 3m long and 600mm wide.
  • Minimal disruption to airport operations.
  • Staff, equipment and operations approved by British Airports Authority and Department of Transport.
  • Strict adherence to airport security and safety procedures.
  • Limited time frame for completion of project.
  • Operation on-going alongside other contractors.

Solutions

Requirement

  • Brokk 180 remote controlled demolition robot deployed to undertake concrete breaking.
  • Use of specially adapted ‘rock mast’ attachment to drill holes in condemned concrete sections.
  • Further concrete breaking carried out by Brokk 180 using conventional hydraulic hammer.
  • Concrete removed and recycled.
  • Stand-alone three phase generators deployed to provide machinery with autonomous power.
  • Use of qualified, experienced staff with modern equipment.

Key Benefits

  • Demolition robot operated remotely negating operative hand and arm vibration issues.Rock Drilling at Gatwick Airport
  • Brokk’s ‘rock mast’ drilling attachment used to reduce vibrations on air bridge.
  • Concrete debris removed and recycled.

Environmental

  • Brokk demolition robot operated remotely negating operative hand and arm vibration issues.
  • Brokk’s ‘rock mast’ drilling attachment used to reduce vibrations on air bridge.
  • Concrete debris removed and recycled.

Financial

  • Project completed on budget.
  • Minimal vibrations on air bridge affording unimpeded passenger use.
  • Compact dimensions of Brokk 180 machine ensured work could be undertaken adjacent to operational air bridge.
  • Specialist equipment owned and operated by Castle and Pryor ensuring fixed costs and qualified, experienced operators.

Time

  • Project completed on time.